Cadburys T1 / Cadburys T2 / Hopfield RD T1 Substation is a 33 kV primary substation in the United Kingdom, with 9.53 MVA of demand headroom and 0.73 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | CADBURYS T1 / CADBURYS T2 / HOPFIELD RD T1 | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Location | United Kingdom | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 9.53 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 0.73 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 20 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 53.4098, -3.1105 | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 314 grid connections (214 operating, 2,515 MW), 305 power plants (93 operating, 5,342 MW), 7 data centers, 2 transmission lines and 2 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bidston Moss Landfill Scheme | Power plant | 2.3 MW | Operating | 2.5 km |
| The Moss grid connection | Grid connection | 2.5 MW | Operating | 2.6 km |
| Burbo Bank grid connection | Grid connection | 90 MW | Operating | 3.8 km |
| Burbo Bank Energy Storage | Power plant | 2 MW | Operating | 3.9 km |
| Britannia House | Power plant | 10 MW | Cancelled | 4.3 km |
| Gas 2.1 MW grid connection at Arrowe PK Hosp T1 / Champion PLUGS T1 / Champion Plugs T2 / Woodchurch T1 | Grid connection | 2.1 MW | Operating | 4.3 km |
| nLighten Edge Data Centre Liverpool | Data center | — | — | 12 km |
| nLighten Chester | Data center | — | — | 22 km |
| The Babbage Centre | Data center | — | — | 27 km |
Grid operator and place
More from SP Manweb plc
- Aberdyfi T1substation
- Abergele T1 / Pensarn T1substation
- Abergele T1 / Pensarn T1substation
- Abersoch T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
Candidate sites around this substation
1 site of land near Cadburys T1 / Cadburys T2 / Hopfield RD T1 has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 13 ha brownfield site at Former Burtons, Pasture Road, Moreton, Wirral0.25 km · score 38
Other substations in the United Kingdom
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.