Burlington Ave T1 / Freshfield T1 / Marsh Brows T1 / Southport RD T1 Substation

Burlington Ave T1 / Freshfield T1 / Marsh Brows T1 / Southport RD T1 Substation is a 33 kV primary substation in the United Kingdom, with 13.5 MVA of demand headroom and 3.83 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).

Map: where Burlington Ave T1 / Freshfield T1 / Marsh Brows T1 / Southport RD T1 lies
53.5562, -3.0470 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBURLINGTON AVE T1 / FRESHFIELD T1 / MARSH BROWS T1 / SOUTHPORT RD T1SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LocationUnited KingdomSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom13.5 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom3.83 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity28 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kV (levels 33, 11 kV)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates53.5562, -3.0470SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 359 grid connections (239 operating, 2,680 MW), 310 power plants (96 operating, 5,277 MW), 8 data centers, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
North Moss Lane - Solar Photovoltaic FarmPower plant9 MWPermitted2.0 km
Moss Farm (Southport) grid connectionGrid connection16 MWPlanned2.1 km
Jemmys CarrPower plant5 MWUnder construction2.2 km
Altcar Solar Farm grid connectionGrid connection1.8 MWOperating2.5 km
Land at Tip FieldPower plant5 MWUnder construction2.6 km
Hillhouse Sewage Works grid connectionGrid connection1.28 MWOperating4.4 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted24 km
nLighten Edge Data Centre LiverpoolData center——24 km
Data center, England (OSM way 1551100328)Data center——28 km

Grid operator and place

More from SP Manweb plc

Candidate sites around this substation

1 site of land near Burlington Ave T1 / Freshfield T1 / Marsh Brows T1 / Southport RD T1 has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in the United Kingdom

All 4347 substations in the United Kingdom