RARE CONTEXT Request research

Substation · the United Kingdom

Bromborough GT2 / Ellesmere Port GT1 / Hooton PK GT1A / Hooton PK GT2A Substation

Bromborough GT2 / Ellesmere Port GT1 / Hooton PK GT1A / Hooton PK GT2A Substation is a 132 kV bulk supply point in the United Kingdom, with 11.7 MVA of demand headroom and 59.2 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).

Map: where Bromborough GT2 / Ellesmere Port GT1 / Hooton PK GT1A / Hooton PK GT2A lies
53.3342, -2.9642 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBROMBOROUGH GT2 / ELLESMERE PORT GT1 / HOOTON PK GT1A / HOOTON PK GT2ASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LocationUnited KingdomSP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom11.7 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom59.2 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity88.1 MVASP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelBulk supply point (BSP)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kV (levels 132, 33 kV)SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates53.3342, -2.9642SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 371 grid connections (250 operating, 2,744 MW), 345 power plants (114 operating, 5,511 MW), 12 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten Edge Data Centre LiverpoolData center——1.2 km
Cereal Partners grid connectionGrid connection4.6 MWOperating1.5 km
Bromborough DockPower plant3.7 MWOperating1.9 km
Mersey Wharf grid connectionGrid connection16.8 MWOperating2.1 km
Eastham Balacing Services PlantPower plant27 MWCancelled2.2 km
Lever Sunlight grid connectionGrid connection4 MWOperating2.3 km
Bromborough Dock Landfill SchemePower plant3 MWOperating2.7 km
nLighten ChesterData center——10 km
The Babbage CentreData center——15 km

Grid operator and place

More from SP Manweb plc

Candidate sites around this substation

1 site of land near Bromborough GT2 / Ellesmere Port GT1 / Hooton PK GT1A / Hooton PK GT2A has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in the United Kingdom

All 4347 substations in the United Kingdom

Data on this page