Bedrijventerrein · Groningen, Groningen
58 ha for sale on business park Westpoort, Westpoort Fase 1
Westpoort, Westpoort Fase 1 is a business park in Groningen, Groningen with 58.1 ha of land still for sale in 2022, the largest plot 5 ha, of 79 ha of plots; its zoning allows environmental category 5 at most. It lies 0.04 km from the substation 110 kV Vierverlaten (TenneT). The nearest Natura 2000 area, Leekstermeergebied, is 0.62 km away.
Owner, grid capacity and planning status on request.Ask us and we find out who sells the plots still for sale here (the municipality, its port or land company, or a private owner), the free capacity at the nearest substation and what the zoning plan allows.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Land for sale | 58.1 ha (58.1 ha municipal, in 2022) | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Largest plot for sale | 5 ha | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Area | 123 ha (gross, within the park's outline) | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Net area | 79 ha | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Land sold or leased | 20.9 ha (in 2022) | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Type of park | Business park | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Plan phase | Irrevocable zoning plan | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Highest environmental category allowed | 5 | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Asking price | €100/m² (up to €135/m², in 2022) | IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas) · record · CC0 1.0 · checked 24 Oct 2026 |
| Location | Groningen, Groningen | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 53.2064, 6.4780 (a point on the park) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | 110 kV Vierverlaten (0.04 km, park edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | TenneT | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest Natura 2000 area | Leekstermeergebied (0.62 km, edge to edge) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Land price, arable land | €82,448/ha in 2024 (Groningen average, history) | Eurostat apri_lprc · Commercial reuse allowed with attribution · checked 24 Oct 2026 |
| Land price, permanent grassland | €66,603/ha in 2024 (Groningen average, history) | Eurostat apri_lprc · Commercial reuse allowed with attribution · checked 24 Oct 2026 |
| Grid congestion | Available on request (offtake and feed-in status) | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
How it compares
#303 of 589 sites in Groningen and #2,312 of 5,469 in the Netherlands by site score. Larger than 97% of the sites in Groningen. Closer to its substation than 90% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 58.1 ha | 13.3 | 25 |
| Distance to the substation | 0.04 km | 29.4 | 30 |
| Substation voltage | 110 kV | 5 | 20 |
| Distance to Natura 2000 | 0.62 km | 3.1 | 25 |
| Site score | Congestion not public: no adjustment | 51 | 100 |
How the site score works in the Netherlands · Search sites in Groningen
Nearby sites on the same substation
12 other sites have 110 kV Vierverlaten as nearest substation and would compete for its capacity.
- 47 ha site at Hoogkerk C 5891, Groningen0.04 km · score 48
- 49 ha site at Hoogkerk D 2416, Groningen0.62 km · score 45
- 36 ha site at Hoogkerk C 5652, Groningen0.05 km · score 45
- 2.1 ha for sale on business park Kern Hoogkerk, Groningen0 km · score 42
- 45 ha site at Roden Q 68, Noordenveld0.81 km · score 33
- 47 ha site at Roden Q 1671, Noordenveld0.87 km · score 32
- 49 ha site at Hoogkerk C 3485, Groningen1.15 km · score 29
- 67 ha site at Roden Q 1406, Noordenveld1.68 km · score 25
- 38 ha site at Hoogkerk C 5614, Groningen1.64 km · score 25
- 40 ha site at Roden Q 81, Noordenveld1.48 km · score 21
- 32 ha site at Roden Q 1564, Noordenveld1.77 km · score 15
- 0.57 ha for sale on business park De Westerd 1, Peize6.37 km · score 14
Grid capacity around this site
Netbeheer Nederland capaciteitskaart gives each grid area and substation a congestion status for offtake (drawing power) and feed-in (supplying power). We hold that status for 11 grid areas and 11 substations in Groningen. The status for this site's area is available on request.
Is there capacity here?Offtake and feed-in congestion for this site's grid area: available on request.
Request grid capacity- Sites in Groningen623
- Sites in the Netherlands5,731
- 110 kV Vierverlatensubstation
- LeekstermeergebiedNatura 2000
Data on this page
- Source: Eurostat, https://doi.org/10.2908/APRI_LPRC. Eurostat apri_lprc, Commercial reuse allowed with attribution.
- IBIS Bedrijventerreinen, IPO and RVO. IBIS Bedrijventerreinen (IPO, via RVO WarmteAtlas), CC0 1.0.
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- PDOK Natura 2000. PDOK Natura 2000, CC0 1.0.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.