Powered land · South Tyneside, England

40 ha site near Westoe substation, South Tyneside

A candidate site of 40.2 ha in South Tyneside, England: one HM Land Registry INSPIRE title polygon. It lies 1.09 km from the Westoe substation (Northern Powergrid (Northeast) plc), which has 11.5 MVA of demand headroom and 15.2 MW for generation.

Owner, grid capacity and planning status on request.We do not publish owners. Ask us and we look up the registered owner of this title at HM Land Registry, the headroom and connection queue at the nearest substation and the local plan and planning applications, and find out whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area40.2 ha (the area of its INSPIRE polygon, the indicative extent of a registered title)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
INSPIRE polygon58616935 (its id in the HM Land Registry INSPIRE Index Polygons)HM Land Registry INSPIRE Index Polygons · Open Government Licence v3.0 · checked 24 Oct 2026
LocationSouth Tyneside, EnglandRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates54.9888, -1.3937 (a point on the polygon)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationWestoe (1.09 km, polygon edge to the substation's mapped point)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Substation operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom at the substation11.5 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom at the substation15.2 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake) at the substationFull (red on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in) at the substationFull (red on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

The polygon shows where the title lies, not its legal extent: HM Land Registry notes that the extent of a title can only be established from the title plan.

How it compares

#21 of 30 sites in South Tyneside and #2,614 of 4,848 in the United Kingdom by site score. Larger than 41% of the sites in South Tyneside. Closer to its substation than 44% of them.

PartThis sitePointsOf
Area40.2 ha10.630
Distance to the substation1.09 km13.730
Demand headroom at the substation11.5 MVA11.540
Site score36100

How the site score works in the United Kingdom · Search sites in South Tyneside

Nearby sites on the same substation

3 other sites have Westoe as nearest substation and would compete for its capacity.

Data on this page