Powered land · Berlin
111 ha site at Gemarkung Tegel-Forst, Flur 3, Flurstück 854
A candidate site of 111 ha in Berlin, made up of 1 cadastral parcel. It lies 1.87 km from the 110 kV substation Umspannwerk Reinickendorf (Stromnetz Berlin). The nearest transmission substation, Umspannwerk Reuter (380 kV), is 3.6 km away, where the grid development plan lists 5 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 111 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Tegel-Forst, Flur 3, Flurstück 854) | ALKIS Berlin (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026 |
| Location | Berlin | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.5598, 13.2756 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Umspannwerk Reinickendorf (1.87 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Stromnetz Berlin | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Reuter (3.6 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | Replacement/extension 380 kV shunt reactor (2x) (due 2030); 380 kV shunt reactor (1x 176 Mvar) (due 2035); Synchronous condenser (1x) (due 2035) (Netzentwicklungsplan; 2 more measures available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#29 of 44 sites in Berlin and #2,931 of 4,863 in Germany by site score. Larger than 93% of the sites in Berlin. Closer to its substation than 2% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 111 ha | 35 | 35 |
| Distance to the substation | 1.87 km | 2.3 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 47 | 100 |
How the site score works in Germany · Search sites in Berlin
Nearby sites on the same substation
3 other sites have Umspannwerk Reinickendorf as nearest substation and would compete for its capacity.
- 107 ha site at Gemarkung Wedding, Flur 19, Flurstück 6210.32 km · score 74
- 73 ha site at Gemarkung Wedding, Flur 19, Flurstück 6010.46 km · score 61
- 98 ha site at Gemarkung Tegel-Forst, Flur 3, Flurstück 8551.36 km · score 54
- Sites in Berlin46
- Sites in Germany5,000
- Umspannwerk Reinickendorfsubstation
Data on this page
- ALKIS Berlin (open cadastre). ALKIS Berlin (open cadastre), dl-de/zero-2-0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.