Source · Germany
Netzentwicklungsplan Strom: point measures (Punktmaßnahmen)
The companion document of the NEP 2037/2045 (2025) second draft listing the point measures the Bundesnetzagentur does not confirm: 380/110 kV and 380/220 kV transformers, switchgear, loop-ins and customer connections (data centers, electrolysers, batteries) at named stations, with project, operator, Land and the scenarios that need each (Startnetz and Zubaunetz tables, 870 measures) (Germany). Rare Context derives facts from Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) under Restricted without republishing the data itself.
About this source
| Publisher's page | https://www.netzentwicklungsplan.de/sites/default/files/2026-03/NEP_2037_2045_V2025_2_Entwurf_Punktmassnahmen.pdf |
| Licence | Restricted |
| Credit | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) |
| Licence terms | No licence statement in the document ("Begleitdokument zum Netzentwicklungsplan Strom 2037/2045, Version 2025, 2. Entwurf"). The NEP report's CC BY 4.0 grant names the report's own graphics, tables and texts, and the website's Impressum reserves its content ("Eine Vervielfältigung der Seiten oder ihrer Inhalte bedarf der vorherigen schriftlichen Zustimmung der Übertragungsnetzbetreiber"). Held as listed until the operators confirm the CC BY 4.0 of the report covers it (permission request drafted in crm/permissions/netzentwicklungsplan.md). Checked 2026-10-24. |
| Coverage | Germany |
| Access | PDF, read with pipeline/pdf.mjs (pipeline/collectors/netzentwicklungsplan.mjs) |
| Refresh | Quarterly |
Download
Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.
| File | Records | Updated | Last checked |
|---|---|---|---|
| de_substations.jsonl | 2,325 | 24 Oct 2026 | 24 Oct 2026 |
Pages built from this source
- Substations460
Substations
We hold more from Netzentwicklungsplan Strom: point measures (Punktmaßnahmen).1,845 facts we may not republish, such as planned reinforcement, grid operator and location: available on request.
Request this dataData on this page
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.