Power plant · Bridgend, Wales, United Kingdom

Stormy Down (Waste AD)

Stormy Down (Waste AD) is a power plant in Bridgend, Wales, United Kingdom, with 3 MW of capacity, operated by Severn Trent.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBridgend (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressParc Stormy, Stormy Down, Airfield Stormy, Pyle, Bridgend, CF33 4RSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Apr 2015 (permit P/14/700/FUL, Town and Country Planning Act, issued by Bridgend)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Oct 2014 (reference P/14/700/FUL, planning authority Bridgend)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Apr 2015 (granted, reference P/14/700/FUL, planning authority Bridgend)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSevern Trent (Severn Trent (formerly Agrivert))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5077, -3.6689DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Stormy Down (Waste AD) is the 328th-largest of 424 power plants in Wales and the 3,739th-largest of 5,050 in the United Kingdom by capacity; its 3 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales328th of 4249,068 MW<0.1%
United Kingdom3,739th of 5,050115,642 MW<0.1%
All power plants in our data9,653rd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. P/14/700/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 202 grid connections and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Cenin T2, Import MPAN Site 4 Parc Stormy 33KV TX grid connectionGrid connection——0.1 km
Stormy Down PV Generation, Bridgend grid connectionGrid connection——0.2 km
Tythegston, Stormy Lane, Stormy Down grid connectionGrid connection——0.4 km
CGI DatacenterData center——6.4 km
Centerprise International (Distribution)Data center——33 km
Microsoft Newport data centreData center——44 km

Operator and place

More from Severn Trent

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page