Power plant · Monmouthshire, Wales, United Kingdom

Llancayo Solar Farm

Llancayo Solar Farm is a solar power plant in Monmouthshire, Wales, United Kingdom, with 3.9 MW of capacity, operated by m03 Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMonmouthshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLlancayo Farm, Llancayo, Usk, Gwent, NP15 1HYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2011DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Jun 2011 (permit DC/2011/00196, Town and Country Planning Act, issued by Monmouthshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Apr 2011 (reference DC/2011/00196, planning authority Monmouthshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Jun 2011 (granted, reference DC/2011/00196, planning authority Monmouthshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Operatorm03 PowerDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area13.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7232, -2.9139DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Monmouthshire, reference DC/2011/00196)
  3. Permit applied for (planning authority Monmouthshire, reference DC/2011/00196)

How it compares

Llancayo Solar Farm is the 330th-largest of 451 power plants in Wales and the 4,194th-largest of 5,834 in the United Kingdom by capacity; its 3.9 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales330th of 45116,665 MW<0.1%
United Kingdom4,194th of 5,834200,500 MW<0.1%
All power plants in our data12,985th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 8 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Vantage Data Centers - CWL13Data center——20 km
Centerprise International NewportData center——21 km
Vantage Data Centers data center, NewportData center——21 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating39 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned43 km
Hinkley Point C ConnectionTransmission line—Permitted44 km

Operator and place

Other power plants in Wales

All 622 power plants in Wales, United Kingdom