Power plant · Newport, Wales, United Kingdom

Leeway House, Leeway Industrial Estate - Battery Energy Storage System

Leeway House, Leeway Industrial Estate - Battery Energy Storage System is a permitted power plant in Newport, Wales, United Kingdom, with 20.6 MW of capacity, operated by Aldustria Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNewport (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLeeway House, Leeway Industrial Estate, Newport, NP19 4SLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Jul 2025 (permit 25/0084, Town and Country Planning Act, issued by Newport)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Feb 2025 (reference 25/0084, planning authority Newport)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Jul 2025 (granted, reference 25/0084, planning authority Newport)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAldustria LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20.6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5725, -2.9458DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Newport, reference 25/0084)
  2. Permit applied for (planning authority Newport, reference 25/0084)

How it compares

Leeway House, Leeway Industrial Estate - Battery Energy Storage System is the 95th-largest of 177 power plants planned, permitted or under construction in Wales and the 1,868th-largest of 3,222 in the United Kingdom by capacity; its 20.6 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales95th of 17716,801 MW0.12%
United Kingdom1,868th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data3,791st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 10 data centers, 2 transmission lines, 1 AI supercomputer and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Vantage Data Centers - CWL13Data center——6.3 km
Vantage Data Centers data center, NewportData center——6.6 km
Centerprise International NewportData center——6.6 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned27 km
Hinkley Point C ConnectionTransmission line—Permitted29 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating34 km
Alderton PrimarySubstation——50 km