Power plant · Torfaen, Wales, United Kingdom

Land East of Panteg Way

Land East of Panteg Way is a cancelled power plant in Torfaen, Wales, United Kingdom, with 5 MW of capacity, operated by Active Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTorfaen (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand East of, Panteg Way, Pontypool, NP4 0LSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Dec 2015 (permit 15/P/00437, Town and Country Planning Act, issued by Torfaen)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Sept 2015 (reference 15/P/00437, planning authority Torfaen)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Dec 2015 (granted, reference 15/P/00437, planning authority Torfaen)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorActive RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6814, -3.0116DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Torfaen, reference 15/P/00437)
  2. Permit applied for (planning authority Torfaen, reference 15/P/00437)

How it compares

Land East of Panteg Way is the 231st-largest of 424 power plants in Wales and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales231st of 4249,068 MW<0.1%
United Kingdom2,742nd of 5,050115,622 MW<0.1%
All power plants in our data8,380th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Centerprise International NewportData center——14 km
Vantage Data Centers data center, NewportData center——14 km
Vantage Data Centers - CWL13Data center——14 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned40 km
Hinkley Point C ConnectionTransmission line—Permitted42 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating42 km

Operator and place

More from Active Renewables

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page