Power plant · Angus, Scotland, United Kingdom

Tealing Solar Energy Park - Phase 2

Tealing Solar Energy Park - Phase 2 is a permitted power plant in Angus, Scotland, United Kingdom, with 110 MW of capacity, operated by Sirius EcoDev Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAngus (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressN/O Leyshade, Tealing, Dundee, DD4 0PXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Mar 2025 (permit ECU00004882, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Nov 2023 (reference ECU00004882, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Mar 2025 (granted, reference ECU00004882, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSirius EcoDev LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity110 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.5318, -2.9279DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Scottish Government (S36), reference ECU00004882)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00004882)

How it compares

Tealing Solar Energy Park - Phase 2 is the 129th-largest of 872 power plants planned, permitted or under construction in Scotland and the 404th-largest of 3,222 in the United Kingdom by capacity; its 110 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland129th of 87299,272 MW0.11%
United Kingdom404th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,220th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 94 grid connections (28 operating, 404 MW) and 68 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Wellbank grid connectionGrid connection25 MWPlanned3.6 km
Longhaugh PrimarySubstation——4.4 km
Midmill Gasholder Station grid connectionGrid connection49.9 MWPlanned5.3 km
Baldovie EFW Line 3 grid connectionGrid connection9.5 MWOperating5.3 km
West Kirkton PrimarySubstation——5.8 km
Old Craigie Road PrimarySubstation——6.1 km

Operator and place

More from Sirius EcoDev Limited

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom