Power plant · Ribble Valley, England, United Kingdom

Calder Works, Burnley Road - Battery Energy Storage System

Calder Works, Burnley Road - Battery Energy Storage System is a cancelled power plant in Ribble Valley, England, United Kingdom, with 70 MW of capacity, operated by Sirius EcoDev Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRibble Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCalder Works, Burnley Road, Burnley, BB12 7NDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Jul 2024 (reference 3/2024/0366, planning authority Ribble Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Sept 2024 (withdrawn, reference 3/2024/0366, planning authority Ribble Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSirius EcoDev LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity70 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7970, -2.3409DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Ribble Valley, reference 3/2024/0366)
  2. Permit applied for (planning authority Ribble Valley, reference 3/2024/0366)

How it compares

Calder Works, Burnley Road - Battery Energy Storage System is the 114th-largest of 3,430 power plants in England and the 215th-largest of 5,050 in the United Kingdom by capacity; its 70 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England114th of 3,43071,965 MW<0.1%
United Kingdom215th of 5,050115,622 MW<0.1%
All power plants in our data1,457th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 485 substations, 458 grid connections (252 operating, 2,199 MW), 17 data centers, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Huntroyde grid connectionGrid connection99.9 MWPlanned0.8 km
PadihamSubstation——1.0 km
Padiham GSPSubstation——1.1 km
Padiham BSPSubstation——1.1 km
Houghton BESS grid connectionGrid connection240 MWPlanned1.3 km
Eaves Farm (Padiham) BESS grid connectionGrid connection99.9 MWPlanned1.4 km
East Irish Sea Transmission ProjectTransmission line—Planned28 km
Lloyds Banking Group CopleyData center——32 km
Data center, England (OSM way 403124345)Data center——32 km

Operator and place

More from Sirius EcoDev Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page