Power plant · Neath Port Talbot, Wales, United Kingdom

Pen Y Cymoedd

Pen Y Cymoedd is a power plant in Neath Port Talbot, Wales, United Kingdom, with 228 MW of capacity, operated by Vattenfall.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNeath Port Talbot (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand stretches from the Upper Afan Valley to end of Cynon Valley.DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Nov 2011 (permit P2009/1053, Town and Country Planning Act, issued by Neath Port Talbot)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Nov 2009 (reference P2009/1053, planning authority Neath Port Talbot)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Nov 2011 (granted, reference P2009/1053, planning authority Neath Port Talbot)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVattenfall (Vattenfall (previously Nuon Renewables))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity228 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units76 units (3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6560, -3.6933DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Neath Port Talbot, reference P2009/1053)
  3. Permit applied for (planning authority Neath Port Talbot, reference P2009/1053)

How it compares

Pen Y Cymoedd is the 7th-largest of 424 power plants in Wales and the 77th-largest of 5,050 in the United Kingdom by capacity; its 228 MW is 0.2% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales7th of 4249,068 MW2.5%
United Kingdom77th of 5,050115,622 MW0.2%
All power plants in our data1,055th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
CGI DatacenterData center——20 km
Centerprise International (Distribution)Data center——32 km
Microsoft Newport data centreData center——47 km
Brechfa Forest ConnectionTransmission line—Permitted48 km

Operator and place

More from Vattenfall

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page