Power plant · Stockton-on-Tees, England, United Kingdom

Wynyard Business Park, North Chapell Lane - Solar Panels

Wynyard Business Park, North Chapell Lane - Solar Panels is a permitted power plant in Stockton-on-Tees, England, United Kingdom, with 3.96 MW of capacity, operated by Northumberland Estates Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStockton-on-Tees (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Of Wynyard Business Park, North Chapell Lane, Wynyard, TS22 5TADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Oct 2022 (permit 22/1800/FUL, Town and Country Planning Act, issued by Stockton-on-Tees)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Aug 2022 (ref. 22/1800/FUL, Stockton-on-Tees)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Oct 2022 (granted, ref. 22/1800/FUL, Stockton-on-Tees)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNorthumberland Estates LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.96 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area6.55 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6317, -1.3127DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Wynyard Business Park, North Chapell Lane - Solar Panels is the 1,723rd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,644th-largest of 3,222 in the United Kingdom by capacity; its 3.96 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,723rd of 2,174186,088 MW<0.1%
United Kingdom2,644th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,796th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 262 grid connections (131 operating, 1,284 MW) and 159 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Solar 6 MW grid connection at WynyardGrid connection6 MWPlanned0.3 km
Gas 17.6 MW grid connection at WynyardGrid connection17.6 MWOperating0.4 km
WynyardSubstation——0.9 km
Solar 5.415 MW grid connection at Billingham Marsh HouseGrid connection5.42 MWOperating2.5 km
Billingham Marsh HouseSubstation——2.5 km
NortonSubstation——5.4 km