Power plant · Stockton-on-Tees, England, United Kingdom
Wynyard Business Park, North Chapell Lane - Solar Panels
Wynyard Business Park, North Chapell Lane - Solar Panels is a permitted power plant in Stockton-on-Tees, England, United Kingdom, with 3.96 MW of capacity, operated by Northumberland Estates Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Stockton-on-Tees (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | North Of Wynyard Business Park, North Chapell Lane, Wynyard, TS22 5TA | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 6 Oct 2022 (permit 22/1800/FUL, Town and Country Planning Act, issued by Stockton-on-Tees) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 12 Aug 2022 (ref. 22/1800/FUL, Stockton-on-Tees) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 6 Oct 2022 (granted, ref. 22/1800/FUL, Stockton-on-Tees) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Northumberland Estates Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 3.96 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 6.55 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.6317, -1.3127 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Wynyard Business Park, North Chapell Lane - Solar Panels is the 1,723rd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,644th-largest of 3,222 in the United Kingdom by capacity; its 3.96 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,723rd of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,644th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,796th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 262 grid connections (131 operating, 1,284 MW) and 159 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar 6 MW grid connection at Wynyard | Grid connection | 6 MW | Planned | 0.3 km |
| Gas 17.6 MW grid connection at Wynyard | Grid connection | 17.6 MW | Operating | 0.4 km |
| Wynyard | Substation | — | — | 0.9 km |
| Solar 5.415 MW grid connection at Billingham Marsh House | Grid connection | 5.42 MW | Operating | 2.5 km |
| Billingham Marsh House | Substation | — | — | 2.5 km |
| Norton | Substation | — | — | 5.4 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.