Power plant · North Lincolnshire, England, United Kingdom

Winterton Landfill Site - Ground Mounted Solar PV Arrays

Winterton Landfill Site - Ground Mounted Solar PV Arrays is a power plant under construction in North Lincolnshire, England, United Kingdom, with 5 MW of capacity, operated by Infinis Solar Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Lincolnshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand on the restored part of Winterton Landfill site, access roads to landfill site, Winterton, DN15 9ANDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date9 Jul 2021 (permit PA/2021/441, Town and Country Planning Act, issued by North Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Mar 2021 (reference PA/2021/441, planning authority North Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 Jul 2021 (granted, reference PA/2021/441, planning authority North Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInfinis Solar Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area13.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.6766, -0.6288DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority North Lincolnshire, reference PA/2021/441)
  3. Permit applied for (planning authority North Lincolnshire, reference PA/2021/441)

How it compares

Winterton Landfill Site - Ground Mounted Solar PV Arrays is the 1,613th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,484th-largest of 3,222 in the United Kingdom by capacity; its 5 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,613th of 2,174185,888 MW<0.1%
United Kingdom2,484th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,616th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 377 grid connections (187 operating, 2,647 MW), 177 substations, 3 transmission lines, 2 data centers and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 4.5 MW grid connection at South FerribyGrid connection4.5 MWPlanned0.3 km
Waste 2.375 MW grid connection at South FerribyGrid connection2.38 MWOperating0.3 km
Wind 36 MW grid connection at Barkers Holt Wind FarmGrid connection36 MWPlanned2.9 km
South FerribySubstation——6.4 km
Skillings LaneSubstation——6.5 km
Billet LaneSubstation——7.1 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled20 km
North Humber to High MarnhamTransmission line—Planned29 km
ThalesData center——37 km

Operator and place

Grid connections attached to this power plant

More from Infinis Solar Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page