Power plant · Merton, England, United Kingdom

Willow Lane Wind Turbines

Willow Lane Wind Turbines is a cancelled power plant in Merton, England, United Kingdom, with 11 MW of capacity, operated by Chancerygate.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMerton (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address2-4 Willow Lane Industrial Estate Mitcham Junction Near MertonDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Aug 2004 (Town and Country Planning Act, issued by Merton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Jun 2004 (planning authority Merton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Aug 2004 (granted, planning authority Merton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorChancerygateDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity11 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units10 units (1.1 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3928, -0.1536DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Merton)
  2. Permit applied for (planning authority Merton)

How it compares

Willow Lane Wind Turbines is the 1,033rd-largest of 3,430 power plants in England and the 1,758th-largest of 5,050 in the United Kingdom by capacity; its 11 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,033rd of 3,43071,965 MW<0.1%
United Kingdom1,758th of 5,050115,622 MW<0.1%
All power plants in our data6,726th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 150 data centers (1 operating, 88 MW), 124 substations, 49 grid connections (30 operating, 313 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
CapitalLand - CroydenData center——1.5 km
Segro Croydon (Morgan Stanley)Data center——1.6 km
Pulsant South LondonData center——5.0 km
Harvard lane PrimarySubstation——13 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating14 km
Southfield Road PrimarySubstation——15 km
Tertiary Study grid connectionGrid connection57 MWPlanned15 km
Goldsmiths PrimarySubstation——15 km
Brentford F C Training Ground 100 grid connectionGrid connection120 MWPlanned17 km

Operator and place