Power plant · Buckinghamshire, England, United Kingdom

Whirlbush Farm, Kingsey - Solar Farm & Battery Storage

Whirlbush Farm, Kingsey - Solar Farm & Battery Storage is a permitted power plant in Buckinghamshire, England, United Kingdom, with 49.9 MW of capacity, operated by Stark Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBuckinghamshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWhirlbush Farm, Risborough Road, Kingsey, Aylesbury, HP17 8NEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Mar 2022 (permit 21/02821/APP, Town and Country Planning Act, issued by Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jul 2021 (reference 21/02821/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Mar 2022 (granted, reference 21/02821/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorStark EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area49.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7585, -0.8966DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Whirlbush Farm, Kingsey - Solar Farm & Battery Storage is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 218 grid connections (67 operating, 783 MW), 186 substations and 90 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Lewknor Solar grid connectionGrid connection49.9 MWPlanned9.4 km
Data center, England (OSM way 1460602301)Data center—Under construction9.8 km
Rycote Farm grid connectionGrid connection47.5 MWPlanned9.8 km
Harlesford Solar Farm grid connectionGrid connection20 MWPlanned13 km
Stokenchurch PrimarySubstation——13 km
Watlington PrimarySubstation——15 km
Data center, England (OSM way 1254986167)Data center——15 km
Wheatley PrimarySubstation——16 km
CapitaLand Ascendas REIT data center, High WycombeData center——17 km