Power plant · Lichfield, England, United Kingdom
Haunton Solar Farm
Haunton Solar Farm is a permitted power plant in Lichfield, England, United Kingdom, with 49.9 MW of capacity, operated by Stark Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Lichfield (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | S/O Main Road, B79 9HT | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 7 Apr 2022 (permit 20/01245/FULM, Town and Country Planning Act, issued by Lichfield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 27 Nov 2020 (reference 20/01245/FULM, planning authority Lichfield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 7 Apr 2022 (granted, reference 20/01245/FULM, planning authority Lichfield) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Stark Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 79.5 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.6910, -1.6521 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Haunton Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 514th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 886th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,966th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 416 grid connections, 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Haunton Manor Farm Solar grid connection | Grid connection | — | — | 0.8 km |
| Thorpe Constantine Solar PV grid connection | Grid connection | — | — | 1.9 km |
| Land and Builds Lying to the grid connection | Grid connection | — | — | 4.7 km |
| Data center, England (OSM way 710050084) | Data center | — | — | 25 km |
| Hutchison 3G | Data center | — | — | 30 km |
| EE Data Centre | Data center | — | — | 31 km |
| Chesterfield to Willington | Transmission line | — | Planned | 40 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 48 km |
Operator and place
More from Stark Energy
- Pilmoor Solar Farm50 MW · permitted
- Thornton Estate - Solar PV Panels50 MW · planned
- Newlands Farm, Turnham Lane - Solar PV Panels49.9 MW · planned
- Whirlbush Farm, Kingsey - Solar Farm & Battery Storage49.9 MW · permitted
- Glebe Farm Solar Farm38.8 MW
- Littleton Solar Farm30 MW
- Potterne Park Farm grid connection49.9 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.