Power plant · Somerset, England, United Kingdom
Walpole Landfill AD (Waste AD)
Walpole Landfill AD (Waste AD) is a power plant in Somerset, England, United Kingdom, with 1.6 MW of capacity, operated by Viridor.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Somerset (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Pawlett, Bridgwater, | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2014 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 17 May 2010 (permit 41/10/00007, Town and Country Planning Act, issued by Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Apr 2010 (reference 41/10/00007, planning authority Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 May 2010 (granted, reference 41/10/00007, planning authority Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Viridor | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.6 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Anaerobic Digestion | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.1843, -2.9803 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Walpole Landfill AD (Waste AD) is the 3,022nd-largest of 3,430 power plants in England and the 4,487th-largest of 5,050 in the United Kingdom by capacity; its 1.6 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,022nd of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,487th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 10,955th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 41/10/00007
- Started operating
Nearby
Within 50 km of this power plant: 41 grid connections (25 operating, 198 MW), 18 substations, 7 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tata Communications Highbridge Datacentre | Data center | — | — | 5.0 km |
| Insight Data Ltd | Data center | — | — | 20 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 20 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 22 km |
| Fleet Air Arm Museum grid connection | Grid connection | 4.01 MW | Operating | 30 km |
| Southfield Farm Solar Park grid connection | Grid connection | 7.6 MW | Operating | 32 km |
| Chiltern Cantello grid connection | Grid connection | 4.75 MW | Operating | 34 km |
| Chilton Cantello Primary | Substation | — | — | 34 km |
| Sparkford Primary | Substation | — | — | 34 km |
Operator and place
More from Viridor
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.