Power plant · Bassetlaw, England, United Kingdom

Walmoor Farm solar park

Walmoor Farm solar park is a power plant in Bassetlaw, England, United Kingdom, with 4 MW of capacity, operated by Green Switch Solutions.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBassetlaw (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand To South West Of Greenfields Grove Road Retford Nottinghamshire, DN22DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Apr 2014 (permit 14/00034/FUL, Town and Country Planning Act, issued by Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Jan 2014 (reference 14/00034/FUL, planning authority Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Apr 2014 (granted, reference 14/00034/FUL, planning authority Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Switch SolutionsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.3034, -0.9163DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Walmoor Farm solar park is the 2,350th-largest of 3,430 power plants in England and the 3,494th-largest of 5,050 in the United Kingdom by capacity; its 4 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,350th of 3,43071,985 MW<0.1%
United Kingdom3,494th of 5,050115,642 MW<0.1%
All power plants in our data9,252nd of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 14/00034/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 434 grid connections (112 operating, 1,395 MW), 155 substations, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Walmoor Farm Retford grid connectionGrid connection——0.2 km
Brecks Farm grid connectionGrid connection——3.2 km
Land OFF, Brecks Farm grid connectionGrid connection——3.2 km
Lea RoadSubstation——14 km
StowSubstation——15 km
Corringham RoadSubstation——15 km
North Humber to High MarnhamTransmission line—Planned18 km
ThalesData center——26 km
Digital Space DC - NewarkData center——26 km

Operator and place

More from Green Switch Solutions

Other power plants in England

All 5809 power plants in England, United Kingdom