Power plant · Doncaster, England, United Kingdom

Partridge Hill Solar Farm

Partridge Hill Solar Farm is a permitted power plant in Doncaster, England, United Kingdom, with 33 MW of capacity, operated by Belvedere Energy Developments and Green Switch Solutions.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDoncaster (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPartridge Hill Farm, High Common Lane, Austerfield, Doncaster, South Yorkshire, DN10 6HADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date29 Jul 2016 (permit 15/01268/FULM, Town and Country Planning Act, issued by Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 May 2015 (ref. 15/01268/FULM, Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Jul 2016 (granted, ref. 15/01268/FULM, Doncaster)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBelvedere Energy DevelopmentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Switch SolutionsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity33 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area54.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.4621, -1.0132DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Partridge Hill Solar Farm is the 971st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,543rd-largest of 3,222 in the United Kingdom by capacity; its 33 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England971st of 2,174186,088 MW<0.1%
United Kingdom1,543rd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,914th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 488 grid connections (175 operating, 2,036 MW), 224 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 40 MW grid connection at Bawtry SolarGrid connection40 MWPlanned0.1 km
AusterfieldSubstation——0.7 km
Austerfield, Bawtry Road, Norwith Farm, Misson Solar Farm grid connectionGrid connection——2.9 km
Solar 8 MW grid connection at Doncaster Inland PortGrid connection8 MWPlanned5.2 km
West End LaneSubstation——5.4 km
HarworthSubstation——6.1 km
North Humber to High MarnhamTransmission line—Planned9.8 km

Operators and place

Grid connections attached to this power plant

More from Belvedere Energy Developments

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page