Power plant · County Durham, England, United Kingdom

Walkway

Walkway is a power plant in County Durham, England, United Kingdom, with 14 MW of capacity, operated by Wind Prospect.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSedgefieldDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2008DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Feb 2005 (Town and Country Planning Act, issued by County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Nov 2004 (planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Feb 2005 (granted, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWind ProspectDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units7 units (2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6647, -1.3937DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority County Durham)
  3. Permit applied for (planning authority County Durham)

How it compares

Walkway is the 838th-largest of 3,430 power plants in England and the 1,490th-largest of 5,050 in the United Kingdom by capacity; its 14 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England838th of 3,43071,965 MW<0.1%
United Kingdom1,490th of 5,050115,622 MW<0.1%
All power plants in our data5,490th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 270 grid connections (136 operating, 1,298 MW), 162 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wind 20 MW grid connection at FishburnGrid connection20 MWOperating0.4 km
Wind 13.4 MW grid connection at WynyardGrid connection13.4 MWOperating1.8 km
Waste 2 MW grid connection at FishburnGrid connection2 MWOperating4.2 km
FishburnSubstation——4.3 km
WynyardSubstation——5.7 km
DXC Wynyard Data CenterData center——6.4 km
HartmoorSubstation——7.8 km
Pulsant data center, EnglandData center——14 km
Lumen Technologies data center, MiddlesbroughData center——14 km

Operator and place

More from Wind Prospect

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page