Power plant · Fenland, England, United Kingdom

Tydd Solar Farm

Tydd Solar Farm is a cancelled power plant in Fenland, England, United Kingdom, with 25 MW of capacity, operated by Pathfinder Clean Energy UK Dev Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFenland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Guanockgate Road, Sutton St Edmund, Spalding, Wisbech, PE13 4PLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 May 2024 (reference F/YR24/0457/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Jun 2025 (refused, reference F/YR24/0457/F, planning authority Fenland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPathfinder Clean Energy UK Dev LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity25 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area66.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6882, 0.0814DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Fenland, reference F/YR24/0457/F)
  2. Permit applied for (planning authority Fenland, reference F/YR24/0457/F)

How it compares

Tydd Solar Farm is the 491st-largest of 3,430 power plants in England and the 918th-largest of 5,050 in the United Kingdom by capacity; its 25 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England491st of 3,43071,965 MW<0.1%
United Kingdom918th of 5,050115,622 MW<0.1%
All power plants in our data3,326th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 4 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Positive ParkData center——12 km
Kings Lynn B Connection ProjectTransmission line—Permitted20 km
Longmarsh Green EnergyData center—Planned20 km
Data center, England (OSM way 87850427)Data center——27 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned33 km
Triton Knoll Electrical SystemTransmission line—Permitted34 km

Operator and place

More from Pathfinder Clean Energy UK Dev Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page