Thurleigh Road - Battery Energy Storage is a permitted power plant in Bedford, England, United Kingdom, with 69 MW of capacity, operated by Pathfinder Clean Energy UK Dev Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBedford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThurleigh Road, Milton Ernest, Bedford, MK41 6ABDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date30 Jan 2024 (permit 23/01139/MAF, Town and Country Planning Act, issued by Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jun 2023 (reference 23/01139/MAF, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Jan 2024 (granted, reference 23/01139/MAF, planning authority Bedford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPathfinder Clean Energy UK Dev LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity69 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1798, -0.4983DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Thurleigh Road - Battery Energy Storage is the 371st-largest of 2,174 power plants planned, permitted or under construction in England and the 642nd-largest of 3,222 in the United Kingdom by capacity; its 69 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England371st of 2,174186,088 MW<0.1%
United Kingdom642nd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,598th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 17 data centers, 2 substations and 2 grid connections (1 operating, 4.75 MW), measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Pulsant Milton Keynes SE-1Data center——22 km
Data center, England (OSM way 460010263)Data center——22 km
nLighten Milton KeynesData center——27 km
East Claydon GSPSubstation——40 km
Pembridge Farm grid connectionGrid connection131 MWPlanned48 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating49 km
Cottisford PrimarySubstation——50 km

Operator and place

More from Pathfinder Clean Energy UK Dev Limited

Other power plants in England

All 5809 power plants in England, United Kingdom