Flag Fen Sewage Treatment Works grid connection

Flag Fen Sewage Treatment Works grid connection is a grid connection in England, United Kingdom, with 2.5 MW of capacity, held by Anglian Water Services Limited.

Map: where Flag Fen Sewage Treatment Works grid connection lies
52.5696, -0.2000 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Peterborough East Grid 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderAnglian Water Services LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toPeterborough East Grid 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity2.5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyOilUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date1 Jan 1997UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.5696, -0.2000UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Flag Fen Sewage Treatment Works grid connection is the 2,871st-largest of 3,539 grid connections in England and the 3,939th-largest of 4,870 in the United Kingdom by capacity; its 2.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,871st of 3,539341,715 MW<0.1%
United Kingdom3,939th of 4,870467,981 MW<0.1%
All grid connections in our data7,670th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 393 power plants (139 operating, 4,890 MW), 72 substations, 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Third Drove, Fengate - Battery StoragePower plant50 MWCancelled0.2 km
Peterborough EfWPower plant7.3 MWOperating0.7 km
Peterborough Power Station PPL2 Gas EnginesPower plant49 MWOperating0.9 km
Funthams Ln Primary 11kVSubstation——2.2 km
Peterborough East Grid 11kVSubstation——2.3 km
Peterborough Central 11kVSubstation——2.9 km
Data center, England (OSM way 87850427)Data center——4.5 km
Positive ParkData center——17 km
The Horizon CentreData center——31 km

Holder, grid operator and place

More from Anglian Water Services Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom