Power plant · Stockton-on-Tees, England, United Kingdom

The Brick Bank Battery Storage

The Brick Bank Battery Storage is a cancelled battery storage plant in Stockton-on-Tees, England, United Kingdom, with 7 MW of capacity, operated by Levington Developments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStockton-on-Tees (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand, Malleable Way, Stockton-On-Tees, Cleveland, TS18 2QXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date8 Jan 2019 (permit 18/1521/FUL, Town and Country Planning Act, issued by Stockton-on-Tees)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Jul 2018 (reference 18/1521/FUL, planning authority Stockton-on-Tees)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Jan 2019 (granted, reference 18/1521/FUL, planning authority Stockton-on-Tees)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLevington Developments (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5715, -1.2902DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Stockton-on-Tees, reference 18/1521/FUL)
  3. Permit applied for (planning authority Stockton-on-Tees, reference 18/1521/FUL)

How it compares

The Brick Bank is the 1,880th-largest of 4,036 power plants in England and the 2,892nd-largest of 5,837 in the United Kingdom by capacity; its 7 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,880th of 4,036134,406 MW<0.1%
United Kingdom2,892nd of 5,837200,833 MW<0.1%
All power plants in our data8,597th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 245 grid connections (126 operating, 1,265 MW), 141 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
MalleableSubstation——0.1 km
Growhow UK Ltd (Billingham) grid connectionGrid connection21.9 MWOperating1.8 km
Oil 6 MW grid connection at North Tees T3 T4Grid connection6 MWOperating1.9 km
Gas 3 MW grid connection at LuciteGrid connection3 MWOperating2.2 km
Faraday StreetSubstation——2.7 km
Pulsant data center, EnglandData center——2.8 km
North TeesSubstation——2.8 km
Lumen Technologies data center, MiddlesbroughData center——3.6 km
DXC Wynyard Data CenterData center——7.0 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page