Power plant · Doncaster, England, United Kingdom
The Balk, Almholme - Energy Storage System
The Balk, Almholme - Energy Storage System is a permitted power plant in Doncaster, England, United Kingdom, with 1,025 MW of capacity, operated by Innova Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Doncaster (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | The Balk, Almholme, Doncaster, DN5 0LL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 14 Oct 2024 (permit 23/02482/FULM, Town and Country Planning Act, issued by Doncaster) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 29 Nov 2023 (reference 23/02482/FULM, planning authority Doncaster) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 14 Oct 2024 (granted, reference 23/02482/FULM, planning authority Doncaster) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Innova Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1,025 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.5679, -1.1282 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
The Balk, Almholme - Energy Storage System is the 28th-largest of 2,174 power plants planned, permitted or under construction in England and the 47th-largest of 3,222 in the United Kingdom by capacity; its 1,025 MW is 0.34% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 28th of 2,174 | 186,088 MW | 0.55% |
| United Kingdom | 47th of 3,222 | 300,661 MW | 0.34% |
| All power plants planned, permitted or under construction in our data | 73rd of 6,455 | 664,240 MW | 0.15% |
Nearby
Within 50 km of this power plant: 410 grid connections (211 operating, 2,269 MW), 335 substations, 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bentley | Substation | — | — | 1.4 km |
| Battery storage 180 MW grid connection at Fordstead Lane BESS | Grid connection | 180 MW | Planned | 3.0 km |
| Battery storage and Solar 89.9 MW grid connection at South Road Mixed Tech | Grid connection | 89.9 MW | Planned | 3.0 km |
| Rockware | Substation | — | — | 3.1 km |
| Wheatley Park | Substation | — | — | 3.2 km |
| Prosper De Mulder Ltd grid connection | Grid connection | 3.61 MW | Operating | 3.3 km |
| Thales | Data center | — | — | 7.2 km |
| North Humber to High Marnham | Transmission line | — | Planned | 21 km |
| HSBC Wakefield Data Centre | Data center | — | — | 22 km |
Operator and place
More from Innova Renewables
- Fanny House Farm, Bay Gateway - Battery Storage940 MW · permitted
- Blackdyke Farm, Blackford - Battery Storage400 MW · permitted
- Bronwylfa Road, Rhostyllen - Energy Storage System400 MW · planned
- Stenson Lane - Battery Energy Storage System400 MW · permitted
- Lletty Scilp Farm, Swansea North - Energy Storage System400 MW · permitted
- Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage49.9 MW · permitted
- The Balk, Almholme - Solar Farm49.9 MW · permitted
- Ducklington Solar Farm36 MW · under construction
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.