Power plant · Cumberland, England, United Kingdom

Blackdyke Farm, Blackford - Battery Storage

Blackdyke Farm, Blackford - Battery Storage is a permitted power plant in Cumberland, England, United Kingdom, with 400 MW of capacity, operated by Innova Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWest of Blackdyke Farm, Blackford, CA6 4EYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Oct 2023 (permit 23/0444, Town and Country Planning Act, issued by Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Jun 2023 (reference 23/0444, planning authority Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Oct 2023 (granted, reference 23/0444, planning authority Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInnova RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity400 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.9547, -2.9654DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Cumberland, reference 23/0444)
  2. Permit applied for (planning authority Cumberland, reference 23/0444)

How it compares

Blackdyke Farm, Blackford - Battery Storage is the 103rd-largest of 2,174 power plants planned, permitted or under construction in England and the 157th-largest of 3,222 in the United Kingdom by capacity; its 400 MW is 0.13% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England103rd of 2,174185,888 MW0.22%
United Kingdom157th of 3,222300,461 MW0.13%
All power plants planned, permitted or under construction in our data351st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 79 grid connections (38 operating, 446 MW), 37 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Project Willow Bank grid connectionGrid connection99.4 MWPlanned0.3 km
Newtown of Rockcliffe grid connectionGrid connection99.9 MWPlanned0.8 km
Newtown Farm grid connectionGrid connection100 MWPlanned0.9 km
Harker / Hutton GSPSubstation——1.4 km
Carlisle North BSPSubstation——2.3 km
WestlintonSubstation——2.4 km
Cross Border Connection (England)Transmission line—Planned24 km

Operator and place

More from Innova Renewables

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page