Thanet Way, Herne Bay Solar Farm is a cancelled power plant in Canterbury, England, United Kingdom, with 20 MW of capacity, operated by Vattenfall.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCanterbury (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand To The South Of Thanet Way (A299), CT6 7NUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Mar 2021 (permit CA/20/02204, Town and Country Planning Act, issued by Canterbury)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Oct 2020 (reference CA/20/02204, planning authority Canterbury)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Mar 2021 (granted, reference CA/20/02204, planning authority Canterbury)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorVattenfallDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area27.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.3515, 1.0927DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Canterbury, reference CA/20/02204)
  3. Permit applied for (planning authority Canterbury, reference CA/20/02204)

How it compares

Thanet Way, Herne Bay Solar Farm is the 573rd-largest of 3,430 power plants in England and the 1,079th-largest of 5,050 in the United Kingdom by capacity; its 20 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England573rd of 3,43071,965 MW<0.1%
United Kingdom1,079th of 5,050115,622 MW<0.1%
All power plants in our data3,931st of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Richborough Connection ProjectTransmission line—Permitted11 km
The Bunker - South East Data CentreData center——17 km
Sota DatacentreData center——26 km
CustodianDC MaidstoneData center——39 km

Operator and place

More from Vattenfall

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page