Power plant · Uttlesford, England, United Kingdom

Stanstead Solar Project

Stanstead Solar Project is a power plant under construction in Uttlesford, England, United Kingdom, with 14.3 MW of capacity, operated by Manchester Airport Group Plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationUttlesford (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Coopers End Road, CM22 6PLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date24 Aug 2022 (permit S62A/22/0000004, Town and Country Planning Act, issued by Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Jun 2022 (reference S62A/22/0000004, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Aug 2022 (secretary of state granted, reference S62A/22/0000004, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Aug 2022 (granted, reference S62A/22/0000004, planning authority Uttlesford)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorManchester Airport Group PlcDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area22.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8884, 0.2690DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (secretary of state granted, planning authority Uttlesford, reference S62A/22/0000004)
  3. Permit granted (planning authority Uttlesford, reference S62A/22/0000004)
  4. Permit applied for (planning authority Uttlesford, reference S62A/22/0000004)

How it compares

Stanstead Solar Project is the 1,382nd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,150th-largest of 3,222 in the United Kingdom by capacity; its 14.3 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,382nd of 2,174185,888 MW<0.1%
United Kingdom2,150th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data4,585th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 54 data centers (1 operating, 88 MW), 2 transmission lines, 2 grid connections (1 operating, 6.94 MW) and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
NVIDIA Cambridge-1AI supercomputer202 H100eOperating16 km
Kao Data KLON-02Data center——16 km
Kao Data KLON-01Data center——16 km
Google Datacentre Waltham CrossData center——31 km
North London (Electricity Line) ReinforcementTransmission line—Permitted38 km
Bramford to TwinsteadTransmission line—Permitted42 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating46 km
Tertiary Study grid connectionGrid connection57 MWPlanned48 km

Operator and place

More from Manchester Airport Group Plc

Other power plants in England

All 5809 power plants in England, United Kingdom