Power plant · Tonbridge and Malling, England, United Kingdom

Stangate West Landfill Site, Quarry Hill Road - Solar Park & Battery

Stangate West Landfill Site, Quarry Hill Road - Solar Park & Battery is a planned power plant in Tonbridge and Malling, England, United Kingdom, with 6 MW of capacity, operated by Infinis Solar Development Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTonbridge and Malling (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressStangate West Landfill Site, Quarry Hill Road, Borough Green, TN15 8RWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 May 2026 (reference KCC/TM/0064/2026, planning authority Tonbridge and Malling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInfinis Solar Development LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2888, 0.3061DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Tonbridge and Malling, reference KCC/TM/0064/2026)

How it compares

Stangate West Landfill Site, Quarry Hill Road - Solar Park & Battery is the 1,576th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,433rd-largest of 3,222 in the United Kingdom by capacity; its 6 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,576th of 2,174185,888 MW<0.1%
United Kingdom2,433rd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,556th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 72 data centers, 18 substations, 3 grid connections (2 operating, 9.14 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——17 km
CustodianDC MaidstoneData center——17 km
CustodianDC DA2Data center——19 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating28 km
Tertiary Study grid connectionGrid connection57 MWPlanned38 km
North London (Electricity Line) ReinforcementTransmission line—Permitted43 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating44 km
Harvard lane PrimarySubstation——46 km
Southfield Road PrimarySubstation——46 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom