Power plant · Redcar and Cleveland, England, United Kingdom

Redcar Energy Centre

Redcar Energy Centre is a permitted power plant in Redcar and Cleveland, England, United Kingdom, with 49.9 MW of capacity, operated by Redcar Holdings.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRedcar Bulk Terminal, Lackenby Works, Middlesbrough, Cleveland, TS6DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Jan 2021 (permit R/2020/0411/FFM, Town and Country Planning Act, issued by Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Aug 2020 (reference R/2020/0411/FFM, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Jan 2021 (granted, reference R/2020/0411/FFM, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRedcar HoldingsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6267, -1.1358DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Redcar and Cleveland, reference R/2020/0411/FFM)
  2. Permit applied for (planning authority Redcar and Cleveland, reference R/2020/0411/FFM)

How it compares

Redcar Energy Centre is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174185,888 MW<0.1%
United Kingdom886th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 237 grid connections (121 operating, 1,228 MW), 135 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gas 50 MW grid connection at Phillips PetroleumGrid connection50 MWPlanned2.4 km
Gas 76 MW grid connection at Phillips PetroleumGrid connection76 MWOperating2.4 km
Teesside Windfarm Ltd grid connectionGrid connection62 MWOperating2.5 km
Tees Industrial T1 T2Substation——3.1 km
Greatham DirectSubstation——4.6 km
Seal SandsSubstation——4.8 km
Data center, Redcar (OSM way 1055031579)Data center——7.7 km
Lumen Technologies data center, MiddlesbroughData center——8.3 km
DXC Wynyard Data CenterData center——11 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page