Power plant · Cheshire West and Chester, England, United Kingdom

Protos Plastics to Hydrogen Facility (Ince)

Protos Plastics to Hydrogen Facility (Ince) is a permitted power plant in Cheshire West and Chester, England, United Kingdom, with 3.8 MW of capacity, operated by Peel Environmental and Waste2Tricity.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCheshire West and Chester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressArea 10B Ince Resource Recover, Grinsome Road, Chester, Cheshire, CH2DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Mar 2020 (permit 19/03489/FUL, Town and Country Planning Act, issued by Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Sept 2019 (reference 19/03489/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Mar 2020 (granted, reference 19/03489/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPeel Environmental (Peel Environmental / Waste2tricity)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWaste2Tricity (Peel Environmental / Waste2tricity)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyHydrogenDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2842, -2.8026DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Cheshire West and Chester, reference 19/03489/FUL)
  2. Permit applied for (planning authority Cheshire West and Chester, reference 19/03489/FUL)

How it compares

Protos Plastics to Hydrogen Facility (Ince) is the 1,727th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,649th-largest of 3,222 in the United Kingdom by capacity; its 3.8 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,727th of 2,174185,888 MW<0.1%
United Kingdom2,649th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,804th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 203 substations, 190 grid connections (115 operating, 830 MW), 18 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
The Babbage CentreData center——6.2 km
nLighten ChesterData center——9.5 km
nLighten Edge Data Centre LiverpoolData center——13 km
Bold GSPSubstation——18 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned21 km
Parkside Railway Station grid connectionGrid connection3 MWOperating22 km
Newton Le WillowsSubstation——23 km
Lymes Wood Landfill Site grid connectionGrid connection1.17 MWOperating23 km
HaydockSubstation——24 km

Operators and place

More from Peel Environmental

Other power plants in England