Owner · Company
Peel Environmental
Peel Environmental operates 6 power plants in the United Kingdom.
Portfolio
The 6 assets and rights Peel Environmental owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 6
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Southmoor Energy Centre | North Yorkshire, England, United Kingdom | Operator | 26 MW |
| Houghton Main | Barnsley, England, United Kingdom | Operator | 20 MW |
| Protos Plastics to Hydrogen Facility (Ince) | Cheshire West and Chester, England, United Kingdom | Operator | 3.8 MW |
| Houghton Main Renewable Energy - AD | Barnsley, England, United Kingdom | Operator | 3 MW |
| North Selby Anaerobic Digestion & Horticultural Glasshouse Project (AD) | North Yorkshire, England, United Kingdom | Operator | 2.8 MW |
| Fletcher Bank Quarry (Waste AD) | Rossendale, England, United Kingdom | Operator | 2 MW |
By country
Where the assets and rights are.
- The United Kingdom6 power plants
Partners and counterparties
Owners, operators and grid operators on the same assets.
- Waste2Tricity1 shared
Own or advise on any of these assets, or looking to buy? Tell us; introductions are private.
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.