Power plant · North Lincolnshire, England, United Kingdom
Pilfrey Solar Farm - Solar Farm
Pilfrey Solar Farm - Solar Farm is a planned solar power plant in North Lincolnshire, England, United Kingdom, with 49.9 MW of capacity, operated by Culham Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Lincolnshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Ealand Road, Keadby, Scunthorpe, DN17 4DG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 6 Aug 2025 (reference PA/2025/444, planning authority North Lincolnshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Culham Renewables (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 85.1 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.5937, -0.7759 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority North Lincolnshire, reference PA/2025/444)
How it compares
Pilfrey Solar Farm - Solar Farm is the 454th-largest of 1,650 power plants planned, permitted or under construction in England and the 800th-largest of 2,548 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 454th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 800th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,897th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 421 grid connections (209 operating, 2,891 MW), 242 substations, 4 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Keadby | Substation | — | — | 1.8 km |
| Gas 123.3 MW grid connection at Broughton Direct | Grid connection | 123 MW | Operating | 2.0 km |
| Solar 49.9 MW grid connection at Chapel Lane PV Direct | Grid connection | 49.9 MW | Planned | 2.4 km |
| Solar 49.999 MW grid connection at Ealand Solar Farm | Grid connection | 50 MW | Planned | 2.4 km |
| Crowle | Substation | — | — | 3.6 km |
| Flixborough | Substation | — | — | 6.0 km |
| North Humber to High Marnham | Transmission line | — | Planned | 16 km |
| Thales | Data center | — | — | 24 km |
| Continental Link Multi-Purpose Interconnector | Transmission line | — | Cancelled | 33 km |
Operator and place
More from Culham Renewables
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.