Power plant · County Durham, England, United Kingdom

PFF Packaging, Salters Lane Industrial Estate, Sedgefield - Solar PV Panels

PFF Packaging, Salters Lane Industrial Estate, Sedgefield - Solar PV Panels is a planned power plant in County Durham, England, United Kingdom, with 1 MW of capacity, operated by SSE Enterprise Contracting.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPff Packaging, Salters Lane Industrial Estate, Sedgefield, Stockton on Tees, TS21 3EEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Mar 2025 (reference DM/25/00776/PN56, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSSE Enterprise ContractingDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6630, -1.4453DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority County Durham, reference DM/25/00776/PN56)

How it compares

PFF Packaging, Salters Lane Industrial Estate, Sedgefield - Solar PV Panels is the 2,080th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,100th-largest of 3,222 in the United Kingdom by capacity; its 1 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England2,080th of 2,174185,888 MW<0.1%
United Kingdom3,100th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,333rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 270 grid connections (136 operating, 1,298 MW), 162 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wind 20 MW grid connection at FishburnGrid connection20 MWOperating2.9 km
West House Farm grid connectionGrid connection41.1 MWPlanned3.5 km
FishburnSubstation——3.6 km
Waste 2 MW grid connection at FishburnGrid connection2 MWOperating3.8 km
SkernesideSubstation——8.2 km
Spennymoor 132/66kVSubstation——8.4 km
DXC Wynyard Data CenterData center——9.3 km
Pulsant data center, EnglandData center——15 km
Lumen Technologies data center, MiddlesbroughData center——16 km

Operator and place

More from SSE Enterprise Contracting

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page