Power plant · North Yorkshire, England, United Kingdom

Northallerton

Northallerton is a cancelled power plant in North Yorkshire, England, United Kingdom, with 28 MW of capacity, operated by Big 60 Million.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWhite House Farm, Great Smeaton, Northallerton, North Yorkshire, DL6 2NFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Oct 2015 (permit 15/01335/FUL, Town and Country Planning Act, issued by North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Jun 2015 (reference 15/01335/FUL, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Oct 2015 (granted, reference 15/01335/FUL, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBig 60 MillionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity28 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area50.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.3511, -1.4383DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority North Yorkshire, reference 15/01335/FUL)
  2. Permit applied for (planning authority North Yorkshire, reference 15/01335/FUL)

How it compares

Northallerton is the 421st-largest of 3,430 power plants in England and the 799th-largest of 5,050 in the United Kingdom by capacity; its 28 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England421st of 3,43071,965 MW<0.1%
United Kingdom799th of 5,050115,622 MW<0.1%
All power plants in our data2,996th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 210 grid connections (104 operating, 1,180 MW), 104 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
NorthallertonSubstation——2.7 km
RomanbySubstation——2.9 km
Solar 9.25 MW grid connection at NorthallertonGrid connection9.25 MWOperating2.9 km
Battery storage 49.5 MW grid connection at Fence Dyke Lane BESSGrid connection49.5 MWPlanned7.6 km
West House Hybrid PV % BESS grid connectionGrid connection100 MWPlanned7.8 km
Leeming Bar/SkeebySubstation——8.2 km
Pulsant data center, EnglandData center——24 km
Lumen Technologies data center, MiddlesbroughData center——28 km
DXC Wynyard Data CenterData center——32 km

Operator and place

More from Big 60 Million

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page