Power plant · North Lincolnshire, England, United Kingdom

North Moor Farm, Keadby - Solar Panels

North Moor Farm, Keadby - Solar Panels is a planned power plant in North Lincolnshire, England, United Kingdom, with 49.9 MW of capacity, operated by Lidsey Renewables Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Lincolnshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Moor Farm, Keadby, Scunthorpe, DN17 3EZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Aug 2025 (ref. PA/2025/445, North Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLidsey Renewables LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area99.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.6144, -0.7367DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

North Moor Farm, Keadby - Solar Panels is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 476 grid connections (211 operating, 2,963 MW), 218 substations, 3 transmission lines and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 99 MW grid connection at Keadby BESS DirectGrid connection99 MWPlanned1.6 km
Solar 49.9 MW grid connection at Chapel Lane PV DirectGrid connection49.9 MWPlanned1.8 km
Solar 49.999 MW grid connection at Ealand Solar FarmGrid connection50 MWPlanned1.8 km
KeadbySubstation——2.1 km
FlixboroughSubstation——2.8 km
Billet LaneSubstation——4.7 km
North Humber to High MarnhamTransmission line—Planned19 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled30 km
Yorkshire GREENTransmission line—Permitted48 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page