Power plant · York, England, United Kingdom

Murton Way - Battery Energy Storage

Murton Way - Battery Energy Storage is a permitted power plant in York, England, United Kingdom, with 100 MW of capacity, operated by First Way Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationYork (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth W/O Murton Way, York, YO19 6AFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Jul 2025 (permit 25/00743/FULM, Town and Country Planning Act, issued by York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Aug 2023 (ref. 25/00743/FULM, York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Jul 2025 (granted, ref. 25/00743/FULM, York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Jul 2025 (appeal granted, ref. 25/00743/FULM, York)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFirst Way Solar LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.8954, -0.9680DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Murton Way - Battery Energy Storage is the 248th-largest of 2,174 power plants planned, permitted or under construction in England and the 426th-largest of 3,222 in the United Kingdom by capacity; its 100 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England248th of 2,174186,088 MW<0.1%
United Kingdom426th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,276th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 398 grid connections (197 operating, 2,531 MW), 255 substations and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 12.5 MW grid connection at ElvingtonGrid connection12.5 MWPlanned2.3 km
ElvingtonSubstation——3.5 km
Solar 20 MW grid connection at Manor Farm Skipwith Road PVGrid connection20 MWPlanned4.0 km
Solar 53.9 MW grid connection at Manor Farm DirectGrid connection53.9 MWPlanned4.0 km
Sandhill LaneSubstation——5.2 km
OsbaldwickSubstation——7.7 km
Yorkshire GREENTransmission line—Permitted20 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled38 km
North Humber to High MarnhamTransmission line—Planned49 km

Operator and place

More from First Way Solar Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page