Substation · England, United Kingdom

Sandhill Lane

Sandhill Lane is an 11 kV primary substation in England, United Kingdom, with 4.65 MVA of demand headroom and 0 MW of generation headroom, connected by Northern Powergrid (Yorkshire) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Yorkshire) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom4.65 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom0 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity8 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimary substationNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromCreyke BeckNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromDriffield/Beverley GroupNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.9179, -0.8987Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 388 grid connections (193 operating, 2,484 MW), 382 power plants (101 operating, 4,072 MW), 5 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Elvington Water Treatment Works - Solar Photovoltaic ArrayPower plant3 MWPermitted2.1 km
Elvington Water Treatment WorksPower plant1.8 MWCancelled2.2 km
Solar 2.66 MW grid connection at ElvingtonGrid connection2.66 MWPlanned2.3 km
Battery storage and Solar 12.5 MW grid connection at ElvingtonGrid connection12.5 MWPlanned3.9 km
Murton Way - Battery Energy StoragePower plant100 MWPermitted5.2 km
Battery storage and Solar 200 MW grid connection at Clock and Grimeston Farm DirectGrid connection200 MWPlanned7.1 km
Yorkshire GREENTransmission line—Permitted25 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled34 km
HSBC Wakefield Data CentreData center——39 km

Grid operator and place

More from Northern Powergrid (Yorkshire) plc

Candidate sites around this substation

12 sites of land near Sandhill Lane have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.