Power plant · Wiltshire, England, United Kingdom

Mopes Lane, Purton - Solar Farm

Mopes Lane, Purton - Solar Farm is a cancelled solar power plant in Wiltshire, England, United Kingdom, with 20 MW of capacity, operated by Spring Dev 08 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHills Minerals & Waste Ltd, Mopes Lane, Purton, SN5 4HGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Apr 2023 (permit PL/2021/10405, Town and Country Planning Act, issued by Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Nov 2021 (reference PL/2021/10405, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Apr 2023 (granted, reference PL/2021/10405, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSpring Dev 08 Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area23.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5982, -1.8718DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Wiltshire, reference PL/2021/10405)
  2. Permit applied for (planning authority Wiltshire, reference PL/2021/10405)

How it compares

Mopes Lane, Purton - Solar Farm is the 878th-largest of 4,036 power plants in England and the 1,482nd-largest of 5,837 in the United Kingdom by capacity; its 20 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England878th of 4,036134,406 MW<0.1%
United Kingdom1,482nd of 5,837200,833 MW<0.1%
All power plants in our data4,543rd of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 191 grid connections (103 operating, 1,211 MW), 129 substations, 11 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ft AH Purton Solar Farm - Solar grid connectionGrid connection19 MWPlanned0.2 km
Purton Solar Farm grid connectionGrid connection3.2 MWPlanned0.2 km
Bentham Solar Farm grid connectionGrid connection8.27 MWOperating1.2 km
Nationwide Swindon Technology CentreData center——3.8 km
Swindon BSPSubstation——3.9 km
Swindon PrimarySubstation——3.9 km
Cricklade PrimarySubstation——4.5 km
VodafoneData center——5.5 km
nLighten SwindonData center——9.8 km

Operator and place

Grid connections attached to this power plant

More from Spring Dev 08 Limited

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page