Bentham House Farm, Mopes Lane - Solar Farm is a permitted power plant in Wiltshire, England, United Kingdom, with 12 MW of capacity, operated by Spring Dev 08 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBentham House Farm, Mopes Lane, Swindon, SN5 4HSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Jun 2025 (permit PL/2024/08441, Town and Country Planning Act, issued by Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Sept 2024 (reference PL/2024/08441, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jun 2025 (granted, reference PL/2024/08441, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSpring Dev 08 LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area22.2 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6014, -1.8628DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Bentham House Farm, Mopes Lane - Solar Farm is the 1,412th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,193rd-largest of 3,222 in the United Kingdom by capacity; its 12 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,412th of 2,174186,088 MW<0.1%
United Kingdom2,193rd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data4,951st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 193 grid connections (105 operating, 1,224 MW), 129 substations, 10 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ft AH Purton Solar Farm - Solar grid connectionGrid connection19 MWPlanned0.9 km
Purton Solar Farm grid connectionGrid connection3.2 MWPlanned0.9 km
Bentham Solar Farm grid connectionGrid connection8.27 MWOperating1.4 km
Swindon BSPSubstation——3.5 km
Swindon PrimarySubstation——3.6 km
Nationwide Swindon Technology CentreData center——3.7 km
Cricklade PrimarySubstation——4.1 km
VodafoneData center——5.7 km
nLighten SwindonData center——9.2 km