Power plant · King's Lynn and West Norfolk, England, United Kingdom

Meadow Farm solar park

Meadow Farm solar park is a solar power plant in King's Lynn and West Norfolk, England, United Kingdom, with 6 MW of capacity, operated by Lightsource Renewable Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationKing's Lynn and West Norfolk (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNW of Main Road Brookville NorfolkDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date30 Jul 2013 (permit 13/00796/FM, Town and Country Planning Act, issued by King's Lynn and West Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date31 May 2013 (reference 13/00796/FM, planning authority King's Lynn and West Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Jul 2013 (granted, reference 13/00796/FM, planning authority King's Lynn and West Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLightsource Renewable EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area13.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5438, 0.5474DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority King's Lynn and West Norfolk, reference 13/00796/FM)
  3. Permit applied for (planning authority King's Lynn and West Norfolk, reference 13/00796/FM)

How it compares

Meadow Farm solar park is the 2,018th-largest of 4,035 power plants in England and the 3,081st-largest of 5,834 in the United Kingdom by capacity; its 6 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,018th of 4,035134,434 MW<0.1%
United Kingdom3,081st of 5,834200,500 MW<0.1%
All power plants in our data11,622nd of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 5 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
US Air Force data center, BrandonData center——16 km
Longmarsh Green EnergyData center—Planned20 km
Kings Lynn B Connection ProjectTransmission line—Permitted23 km
Positive ParkData center——33 km
Norwich to TilburyTransmission line—Planned49 km