Mathurst Solar Farm, Goudhust Road - Solar PV Farm is a planned solar power plant in Maidstone, England, United Kingdom, with 18 MW of capacity, operated by Renewable Connections Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMaidstone (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMathurst Farm Land West Of Goudhurst Road Staplehurst, TN12 0HQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Jul 2024 (reference 24/502235/FULL, planning authority Maidstone)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRenewable Connections Developments Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity18 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area22.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1392, 0.5358DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Maidstone, reference 24/502235/FULL)

How it compares

Mathurst Solar Farm, Goudhust Road - Solar PV Farm is the 1,049th-largest of 1,651 power plants planned, permitted or under construction in England and the 1,700th-largest of 2,549 in the United Kingdom by capacity; its 18 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,049th of 1,651172,174 MW<0.1%
United Kingdom1,700th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data3,824th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 16 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——16 km
CustodianDC MaidstoneData center——16 km
Sota DatacentreData center——24 km