Power plant · East Lindsey, England, United Kingdom
Manor Farm Energy Storage
Manor Farm Energy Storage is a permitted power plant in East Lindsey, England, United Kingdom, with 10 MW of capacity, operated by Innova Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Lindsey (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness, PE24 5AY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 30 Nov 2017 (permit S/051/00772/17, Town and Country Planning Act, issued by East Lindsey) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 2 May 2017 (reference S/051/00772/17, planning authority East Lindsey) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 30 Nov 2017 (granted, reference S/051/00772/17, planning authority East Lindsey) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Innova Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.1482, 0.1952 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority East Lindsey, reference S/051/00772/17)
- Permit applied for (planning authority East Lindsey, reference S/051/00772/17)
How it compares
Manor Farm Energy Storage is the 1,441st-largest of 2,174 power plants planned, permitted or under construction in England and the 2,237th-largest of 3,222 in the United Kingdom by capacity; its 10 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,441st of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 2,237th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,307th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 18 grid connections (8 operating, 83.6 MW), 16 substations and 5 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Grimsby to Walpole | Transmission line | — | Planned | 15 km |
| Ossian Transmission Infrastructure | Transmission line | — | Cancelled | 16 km |
| Solar 5 MW grid connection at South Reston | Grid connection | 5 MW | Operating | 20 km |
| South Reston | Substation | — | — | 20 km |
| Wind 20 MW grid connection at Gayton le Marsh Windfarm | Grid connection | 20 MW | Operating | 25 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 28 km |
| Keddington Road | Substation | — | — | 28 km |
| Louth | Substation | — | — | 29 km |
| Solar 7.5 MW grid connection at Keddington Road | Grid connection | 7.5 MW | Operating | 31 km |
Operator and place
More from Innova Renewables
- The Balk, Almholme - Energy Storage System1,025 MW · permitted
- Fanny House Farm, Bay Gateway - Battery Storage940 MW · permitted
- Blackdyke Farm, Blackford - Battery Storage400 MW · permitted
- Bronwylfa Road, Rhostyllen - Energy Storage System400 MW · planned
- Stenson Lane - Battery Energy Storage System400 MW · permitted
- Lletty Scilp Farm, Swansea North - Energy Storage System400 MW · permitted
- Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage49.9 MW · permitted
- The Balk, Almholme - Solar Farm49.9 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.