Lower Easton Farm is a cancelled power plant in Somerset, England, United Kingdom, with 13.5 MW of capacity, operated by Pylle Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSomerset (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand Off Easton Lane, Pylle, Somerset, BA4 6SYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Jun 2014 (reference 2014/1174/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Oct 2014 (refused, reference 2014/1174/FUL, planning authority Somerset)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPylle SolarDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity13.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area25 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1466, -2.5369DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Somerset, reference 2014/1174/FUL)
  2. Permit applied for (planning authority Somerset, reference 2014/1174/FUL)

How it compares

Lower Easton Farm is the 867th-largest of 3,430 power plants in England and the 1,539th-largest of 5,050 in the United Kingdom by capacity; its 13.5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England867th of 3,43071,965 MW<0.1%
United Kingdom1,539th of 5,050115,622 MW<0.1%
All power plants in our data5,673rd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 119 grid connections (72 operating, 703 MW), 61 substations, 5 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wyke Farms Ltd grid connectionGrid connection1.9 MWOperating5.5 km
Solar 1.254 MW grid connection at Castle CaryGrid connection1.25 MWOperating6.8 km
Bruton PrimarySubstation——7.5 km
Castle Cary PrimarySubstation——7.9 km
Landmark Farm grid connectionGrid connection5.5 MWPlanned9.6 km
Holwell PrimarySubstation——11 km
Hinkley Point C ConnectionTransmission line—Permitted27 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned30 km
Tata Communications Highbridge DatacentreData center——31 km

Operator and place

More from Pylle Solar

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page