Power plant · Maldon, England, United Kingdom
Little Braxted Solar Park
Little Braxted Solar Park is a cancelled power plant in Maldon, England, United Kingdom, with 15 MW of capacity, operated by Lightsource Renewable Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Maldon (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land South Of Little Braxted Hall, Witham Road Little Braxted, Essex | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (appeal withdrawn) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Jan 2013 (reference 13/00036/FUL, planning authority Maldon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 8 Aug 2013 (appeal withdrawn, reference 13/00036/FUL, planning authority Maldon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 14 Jun 2013 (refused, reference 13/00036/FUL, planning authority Maldon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Lightsource Renewable Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 15 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.8021, 0.6646 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Withdrawn (appeal withdrawn, planning authority Maldon, reference 13/00036/FUL)
- Permit refused (planning authority Maldon, reference 13/00036/FUL)
- Permit applied for (planning authority Maldon, reference 13/00036/FUL)
How it compares
Little Braxted Solar Park is the 774th-largest of 3,430 power plants in England and the 1,388th-largest of 5,050 in the United Kingdom by capacity; its 15 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 774th of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 1,388th of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 5,118th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 8 data centers, 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| CityFibre Cabinets | Data center | — | — | 26 km |
| Bramford to Twinstead | Transmission line | — | Permitted | 26 km |
| Imperium 315 | Data center | — | — | 27 km |
| NVIDIA Cambridge-1 | AI supercomputer | 202 H100e | Operating | 37 km |
| Kao Data KLON-02 | Data center | — | — | 37 km |
Operator and place
More from Lightsource Renewable Energy
- Montreathmont Moor Forest42 MW
- Goosehall Solar Farm39.5 MW
- Black Peak Farm31.8 MW
- Munceys Farm31.6 MW
- Netherfield Lane19.7 MW
- Six Hills Solar Farm18.7 MW
- Tye Green Farm14.9 MW
- Waterloo solar park14.6 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.