Power plant · West Lancashire, England, United Kingdom
Lathom (Pilkington Technical Centre) Battery Storage
Lathom (Pilkington Technical Centre) Battery Storage is a battery storage plant in West Lancashire, England, United Kingdom, with 2 MW of capacity, operated by Lightsource Renewable Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | West Lancashire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land To The E/O Lords Cottage, Hall Lane, Lathom, Ormskirk, Lancashire, L40 6JB | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2019 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 31 Aug 2018 (permit 2018/0409/FUL, Town and Country Planning Act, issued by West Lancashire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 17 Apr 2018 (reference 2018/0409/FUL, planning authority West Lancashire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 31 Aug 2018 (granted, reference 2018/0409/FUL, planning authority West Lancashire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Lightsource Renewable Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.5697, -2.8220 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority West Lancashire, reference 2018/0409/FUL)
- Permit applied for (planning authority West Lancashire, reference 2018/0409/FUL)
How it compares
Lathom (Pilkington Technical Centre) Battery Storage is the 3,284th-largest of 4,035 power plants in England and the 4,810th-largest of 5,834 in the United Kingdom by capacity; its 2 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,284th of 4,035 | 134,434 MW | <0.1% |
| United Kingdom | 4,810th of 5,834 | 200,500 MW | <0.1% |
| All power plants in our data | 14,071st of 15,799 | 1,918,113 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 349 grid connections (195 operating, 1,737 MW), 322 substations, 17 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Halsalls Lodge grid connection | Grid connection | 119 MW | Planned | 0.2 km |
| Washway Farm BESS VAR1 grid connection | Grid connection | 85 MW | Planned | 0.6 km |
| Pilkington Technology Centre grid connection | Grid connection | 2 MW | Operating | 0.6 km |
| Washway Farm / Kirkby GSP | Substation | — | — | 0.8 km |
| Skelmersdale BSP | Substation | — | — | 1.9 km |
| Skelmersdale | Substation | — | — | 1.9 km |
| Data center, England (OSM way 1551100328) | Data center | — | — | 16 km |
| Iron Mountain | Data center | — | — | 21 km |
| Verizon Warrington | Data center | — | — | 22 km |
Operator and place
More from Lightsource Renewable Energy
- East Fulwood Energy Storage400 MW · planned
- Hurst Farm, Mansfield Road - Battery Energy Storage System99.9 MW · permitted
- Pentir Substation, Pentir - Battery Energy Storage57 MW
- Plas Power Estate Solar Farm57 MW · planned
- Plas Power Estate Solar Farm57 MW · planned
- Edge Lane, Maiden Law - Solar Farm & Battery Storage49.9 MW · permitted
- The Grange49.9 MW
- South Lowfields Farm49.9 MW
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.