Power plant · Buckinghamshire, England, United Kingdom
Land North of Marlow Landfill Site
Land North of Marlow Landfill Site is a cancelled power plant in Buckinghamshire, England, United Kingdom, with 5 MW of capacity, operated by Anesco.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Buckinghamshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Ld N Of Marlow Landfill Site, Marlow Road, Little Marlow, Marlow, SL7 3RW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 7 Sept 2015 (reference 15/07001/FULEA, planning authority Buckinghamshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 26 Feb 2016 (refused, reference 15/07001/FULEA, planning authority Buckinghamshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Anesco | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 13.2 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.5835, -0.7433 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Land North of Marlow Landfill Site is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,758th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 2,742nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 8,356th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 224 substations, 165 grid connections (80 operating, 873 MW), 124 data centers (1 operating, 88 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Little Marlow Twul PV grid connection | Grid connection | 1.5 MW | Planned | 0.4 km |
| Little Marlow Primary | Substation | — | — | 1.1 km |
| Well End Primary | Substation | — | — | 1.3 km |
| Flackwell Heath Primary | Substation | — | — | 3.8 km |
| Derehams Farm grid connection | Grid connection | 100 MW | Planned | 4.6 km |
| Loudwater grid connection | Grid connection | 40 MW | Operating | 4.6 km |
| CapitaLand Ascendas REIT data center, High Wycombe | Data center | — | — | 4.7 km |
| Spectrum House | Data center | — | — | 6.2 km |
| Pulsant Maidenhead | Data center | — | — | 9.6 km |
Operator and place
More from Anesco
- Persley BESS - Battery Storage70.1 MW · permitted
- Marston Sewerage Pumping Station, Bodymoor Heath Lane - Battery Storage50 MW · planned
- Newton Wood Farm49.9 MW · permitted
- Rothienorman - Battery Storage49.9 MW · permitted
- Turf Carr Solar Farm49.9 MW · permitted
- Overton Grange, Overton Road - Solar Farm Battery Energy Storage49.9 MW · planned
- Low Farm Solar Farm49.9 MW · under construction
- Brentwood nergy Storage System49.9 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.